Ads Search
Numerical digits are located on the telephone, still in good condition. Only requires the data cord to be inserted and will operate. Collection only. Please see my other items that are for sale. Ad ID: Delivery Service Consumer Credit
Used. Works perfectly. About 30 feet in length. Collection only Ad ID: Delivery Services Consumer Credit
Long telephone extension lead with adapter too. If contacting me by phone, please only text. Cash on collection only LE9 Barwell or LE4 Leicester. Only £ 1.50 Thanks Ad ID: Delivery Service Consumer Credit
Still in good condition. Only requires the data cord to be inserted and will operate. Collection only. Have a look at my other items that are for sale. Ad ID: Delivery Service Consumer Credit
Still in good condition. Data cord to be plugged in in order to work. Collection only. Have a look at my other items that are for sale. Ad ID: Delivery Service Consumer Credit
Telephone extension lead 10 meters £2 Ad ID:
Flymo trimmer works fine with mains lead, Long lead Can be seen working Bargain at £15No timewaisters / no texts / no offers Can deliver £, Bristol, .
Caravan Power Lead And House Adapter Really Long Lead (Circa 50 Metre+) Excellent Condition Tested and working perfectly. Absolute bargain only £15!
LONG LIFE LEAD ROPE Extra Strong & Long Brass Clip BLACK / RED / NAVY in Sporting Goods, Equestrian, Horse Wear & Equipment
mains lead, 25 metres long complete with, mains lead, 25 metres long complete with ends, Peterborough,.
Brand new extension lead for home phone pick up only heckmondwike please see my other items thanks
10metres of telephone extension lead new still wrapped. Ad ID: Delivery Service Consumer Credit
Telephone extension lead plus double connector. Approximately 9' long. Working order with no splits. All enquiries answered but please check spam box as some people have found them there. Ad ID:
15 m telephone extension kit from Argos.. brand new oringnal package unopened.
telephone extension lead 45metres or 50 feet comes with two sockets and one in plug Ad ID: Delivery Service Consumer Credit
For sale: Approx 65 foot/ 20 meter long single telephone extension lead. Ad ID: Delivery Service Consumer Credit
30 metres. Brand new, never out of box. Ad ID: Delivery Service Consumer Credit
Telephone extension lead, 10 metres in length, unopened, still in packaging. Buyer collects. Ad ID: Delivery Service Consumer Credit
This telephone lead is approximately 50ft long and on a reel for ease of use. Both phone sockets work and it is sold used but in good condition. Read More
white 20 metre telephone extension lead new in box still Read More
15 metre plus telephone extension lead in a wind up reel very good condition collection only
Good amount of cable - can measure if needed. £1 for collection please from Huntingdon, Cambridgeshire. Ad ID: Delivery Service Consumer Credit
5 metre telephone lead with two way adapter, unused. Read More
telephone extension lead 20 Meters long!! (BRAND NEW,NEVER BEEN USED) £5 O.N.O COLLECTION ONLY!! Or thru paypay and the buyer pays for your own courier to pick it up the item or items but please note there will be a small handless fee of £5 on top of the agreed price!!!!!!! Ad ID:
Telephone extension lead approx 20 mtrs long unused cash on collection only Ad ID: