caravan power lead and house adapter really long lead circa 50 metre

Caravan Power Lead And House Adapter Really Long Lead (Circa 50 Metre+)

Caravan Power Lead And House Adapter Really Long Lead (Circa 50 Metre+)

Caravan Power Lead And House Adapter Really Long Lead (Circa 50 Metre+) Excellent Condition Tested and working perfectly. Absolute bargain only £15!

50 Metre Caravan Mains Hook Up Lead

50 Metre Caravan Mains Hook Up Lead

50 Metre Mains Caravan/Motorhome/Camping Hook up Lead (2 x 25 Metre) H/Duty 2.5mm2 Leads With 16 Amp Blue Plug & Socket Connectors On Each. Unused in Original Packaging. Collection Only B98 7QA Read More

Related products caravan power lead and house adapter really long lead circa 50 metre: 50 Metre Caravan Mains Hook Up Lead
50 Metre Caravan Mains Hook Up Lead

50 Metre Caravan Mains Hook Up Lead

50 Metre Mains Caravan/Motorhome/Camping Hook up Lead (2 x 25 Metre) H/Duty 2.5mm2 Leads With 16 Amp Blue Plug & Socket Connectors On Each. Unused in Original Packaging. Collection Only REDDITCH B98 7QA Read More

25 metre main hook up lead and mains adapter

25 metre main hook up lead and mains adapter

25 metre mains hook up cable and mains adapter for caravan motor home or tent. Only been used once. £44 new for lead and £6 for adapter. Will take £30 for both. Buyer collect. Ad ID:

Related products caravan power lead and house adapter really long lead circa 50 metre: 25 metre main hook up lead and mains adapter
flymo lawnmower power lead/cable approximately 50 feet long

flymo lawnmower power lead/cable approximately 50 feet long

flymo lawnmower power cable in used condition, approximately 50 foot long for details please ring thanks Ad ID: Delivery Service Consumer Credit

caravan mains lead, adapter and carry bag.

caravan mains lead, adapter and carry bag.

25 m camping or caravanning mains lead. comes with home adapter and carry bag. Read more

Related products caravan power lead and house adapter really long lead circa 50 metre: caravan mains lead, adapter and carry bag.
25m Caravan Hook-up Extension Lead (and Adapter)

25m Caravan Hook-up Extension Lead (and Adapter)

As new condition, 25m Electric hook-up / extension cable. Typically for caravans / Campervan etc. £ Ono. Was bought as a temporary cable, and used once. Also comes with adapter to allow connection to a 13-amp 3-pin plug. Ad ID: Delivery Service Consumer Credit

Sky Plus box 500gb with remote power lead and HDMI lead

Sky Plus box 500gb with remote power lead and HDMI lead

Sky Plus box 500gb with remote power lead and HDMI lead - in excellent condition and full working order - £ ono Birtley could deliver locally Ad ID: Delivery Service Consumer Credit

Related products caravan power lead and house adapter really long lead circa 50 metre: Sky Plus box 500gb with remote power lead and HDMI lead
sky hd box plus controls and power lead and hdmi lead

sky hd box plus controls and power lead and hdmi lead

Sky HD box plus controls and all leads new still in box Ad ID: Delivery Service Consumer Credit

1.8M - 2M UK PC Mains Power Cable Kettle Lead Power Lead TFT LCD TV COMPUTER

1.8M - 2M UK PC Mains Power Cable Kettle Lead Power Lead TFT LCD TV COMPUTER

1.8M - 2M UK PC Mains Power Cable Kettle Lead Power Lead TFT LCD TV COMPUTER 1.8M - 2M UK PC Mains Power Cable Kettle Lead Power Lead TFT LCD TV COMPUTER

Related products caravan power lead and house adapter really long lead circa 50 metre: 1.8M - 2M UK PC Mains Power Cable Kettle Lead Power Lead TFT LCD TV COMPUTER
25 metre Caravan mains lead

25 metre Caravan mains lead

25 Mitre Caravan / Motor Home Mains Elec Lead in very good condition Ad ID: Delivery Service Consumer Credit

caravan adapter lead

caravan adapter lead

used caravan adapter lead from 7 pin to 13 pin Read More

Related products caravan power lead and house adapter really long lead circa 50 metre: caravan adapter lead
Caravan adapter lead

Caravan adapter lead

Conversion Lead 7pin Vehicle 12N and 12S to 13pin Caravan 200mm cable Free delivery Birmingham area Read More

CARAVAN 25 METRE HOOK UP LEAD

CARAVAN 25 METRE HOOK UP LEAD

CARAVAN 25 METRE HOOK UP LEAD AND REEL TIDY. GOOD CONDITION. Read more

Related products caravan power lead and house adapter really long lead circa 50 metre: CARAVAN 25 METRE HOOK UP LEAD
25 metre caravan site extension lead.

25 metre caravan site extension lead.

Immaculate condition. Still in packaging. Hardly used. 25m long. Can possibly deliver. Ad ID: Delivery Service Consumer Credit

Caravan towing adapter lead

Caravan towing adapter lead

Hardly used adapter for towing Read More

Related products caravan power lead and house adapter really long lead circa 50 metre: Caravan towing adapter lead
25 Metre Caravan/ Motorhome Hook Up Lead

25 Metre Caravan/ Motorhome Hook Up Lead

25 Metre Caravan / Motorhome H/ Duty 2.5mm2 Orange PVC Extension Hook Up Lead With Blue 16 amp Connectors Unused In Original Packaging (2 available- to make 50 METRE extension Lead) Cash on Collection B98 7QA Read More

25 Metre Caravan/ Motorhome Hook Up Lead

25 Metre Caravan/ Motorhome Hook Up Lead

25 Metre Caravan / Motorhome H/ Duty 2.5mm2 Orange PVC Extension Hook Up Lead With Blue 16 amp Connectors Unused In Original Packaging Cash on Collection B98 7QA Read More

Related products caravan power lead and house adapter really long lead circa 50 metre: 25 Metre Caravan/ Motorhome Hook Up Lead
16 Amp Caravan Mains Lead - 25 Metre

16 Amp Caravan Mains Lead - 25 Metre

Brand New Caravan site mains hook-up lead, 25 metres in length with high visibility orange cable. For connecting your caravan or campsite mains unit up to the site hookup. Heavy duty 2.5mm core (16 Amp cable) as recommended for use on most caravan sites. 25 metre length 16 Amp capacity With mains plug and inline socket Connects caravan or mains unit to campsite hookup Ad ID:

23 metre hook up lead, caravan / camping

23 metre hook up lead, caravan / camping

23 metre electric hook up lead for caravanning or camping. Working condition. Collection Farnborough.

Related products caravan power lead and house adapter really long lead circa 50 metre: 23 metre hook up lead, caravan / camping
Caravan hook up adapter lead

Caravan hook up adapter lead

CARAVAN HOOK UP ADAPTER LEAD, 16 AMP PLUG to 13 AMP 230v 4 WAY EXTENSION / GENERATOR FLY ADAPTER LEAD HOOK-UP Ad ID: Delivery Service Consumer Credit

Heim 20 Metre Long Dog Training Lead - Orange

Heim 20 Metre Long Dog Training Lead - Orange

Heim Long Dog Training Lead - Orange The training leash is made from a high-quality, non-irritating material (polypropylene). The hand strap gives you optimal control of your pet. Especially suited, for controlling at a distance or for track work. Diameter 6mm, Length 20 metres. There are 3 available at £10 each, new and unused still in the packaging. Read more

Related products caravan power lead and house adapter really long lead circa 50 metre: Heim 20 Metre Long Dog Training Lead - Orange
Mains adapter lead for caravan/camping

Mains adapter lead for caravan/camping

25 metre mains adapter lead and separate adapter for caravan, motorhome or camping. Buyer collect Ad ID: Delivery Service Consumer Credit

25 Metre electric hook up lead. Camping or caravan

25 Metre electric hook up lead. Camping or caravan

25 metre electric hook up lead for camping or caravanning. This is a great lead as it is lovely and long. Ad ID: Delivery Service Consumer Credit

Related products caravan power lead and house adapter really long lead circa 50 metre: 25 Metre electric hook up lead. Camping or caravan
16 Amp Caravan Mains hook up Lead - 25 Metre

16 Amp Caravan Mains hook up Lead - 25 Metre

Caravan site mains hook-up lead,. For connecting your caravan or campsite mains unit up to the site hookup. Heavy duty 25 metres in length with high visibility orange cable as recommended for use on most caravan sites. Plus Mains Adapter - 13 Amp Plug To Caravan Mains Socket. 16 Amp capacity 2.5mm core With mains plug and inline socket Connects caravan or mains unit to campsite hookup Used and in excellent condition with no wear spots we used this lead in our tent first hence the rubber 13 amp fused female socket we then purchased the 13 Amp adaptor Plug To Caravan Mains Socket so we could used it with our caravan. will consider reasonable offer Collection only please from milton keynes Read more

Contact