caravan 240v 25m long lead

Caravan 240v 25m long lead

Caravan 240v 25m long lead

Caravan hook up lead 25m long in good condition 240v collection only Ad ID: Delivery Service Consumer Credit

25m 240v caravan mains lead

25m 240v caravan mains lead

Brand new caravan mains lead. 25m long, never used. Buyer collects. Ad ID: Delivery Service Consumer Credit

Related products caravan 240v 25m long lead: 25m 240v caravan mains lead
caravan 240v hook up lead. 80 foot long

caravan 240v hook up lead. 80 foot long

caravan 240v hook up lead. 80 foot long. will post at buyers expense Read More

Extension lead 240v 25m in Liverpool

Extension lead 240v 25m in Liverpool

Extension lead 240v 25 metres excellent working order pick up only anfield

Related products caravan 240v 25m long lead: Extension lead 240v 25m in Liverpool
caravan electrical lead 25m

caravan electrical lead 25m

Caravan electrical lead 25 m, selling due to sale of caravan. No issues with working order. Read more

Caravan hook up lead 25m

Caravan hook up lead 25m

Brand new 25metre hook up lead. Ad ID: Delivery Service Consumer Credit

Related products caravan 240v 25m long lead: Caravan hook up lead 25m
Caravan extension mains lead 25m

Caravan extension mains lead 25m

25m mains lead. Bought but only used once or twice, so in as new condition Ad ID: Delivery Service Consumer Credit

25m Caravan Motorhome electrical lead

25m Caravan Motorhome electrical lead

25m Caravan Motorhome electrical lead RRP £ brand new in packaging 25m Caravan Motorhome electrical lead. Posted by Daniel in Camping & Hiking, Camping Gear in Chandlers Ford. 28 December

Related products caravan 240v 25m long lead: 25m Caravan Motorhome electrical lead
Camping power lead, Caravan, Motorhome, 25m

Camping power lead, Caravan, Motorhome, 25m

Camping power lead, Caravan, Motorhome, 25m. Mains power lead, 16Amp, used in motorhome for 5 years but motorhome has been sold and this was left behind. Ad ID: Delivery Services Consumer Credit

Mains extension lead 25m Boat Caravan

Mains extension lead 25m Boat Caravan

As new hardly used. Read More

Related products caravan 240v 25m long lead: Mains extension lead 25m Boat Caravan
Caravan mains hook up lead 25m

Caravan mains hook up lead 25m

Caravan mains hook up lead complete with adapter so you can plug your van in at home. Caravan sold so no longer required COLLECTION ONLY due to weight. Read More

Caravan Mains Lead 25m Brand new

Caravan Mains Lead 25m Brand new

This is a brand new unopened 25 mtr mains cable as used on caravans. It came with my new caravan but I still have my old one Read more

Related products caravan 240v 25m long lead: Caravan Mains Lead 25m Brand new
25m Caravan/motor home power lead

25m Caravan/motor home power lead

Brand new 25 metre caravan/motor home extension lead. Still in sealed pack with Intact quality assurance label. Ad ID: Delivery Service Consumer Credit

25m Caravan Site Extension Lead & Adapters

25m Caravan Site Extension Lead & Adapters

As new condition, less than 1 year old, used on 2 caravan holidays. Caravan now sold hence sale. Includes U.K. and continental 'mains to caravan' electric adapters. Ad ID: Delivery Service Consumer Credit

Related products caravan 240v 25m long lead: 25m Caravan Site Extension Lead & Adapters
Caravan / camping 25m 16 amp extension lead

Caravan / camping 25m 16 amp extension lead

1 year old extension in good condition

25m Caravan mains electrical lead with keeper

25m Caravan mains electrical lead with keeper

25m site mains hookup electrical lead, with storage case which also helps with winding the cable back in to keep it tidy. Ad ID: Delivery Service Consumer Credit

Related products caravan 240v 25m long lead: 25m Caravan mains electrical lead with keeper
25m Caravan Hook-up Extension Lead (and Adapter)

25m Caravan Hook-up Extension Lead (and Adapter)

As new condition, 25m Electric hook-up / extension cable. Typically for caravans / Campervan etc. £ Ono. Was bought as a temporary cable, and used once. Also comes with adapter to allow connection to a 13-amp 3-pin plug. Ad ID: Delivery Service Consumer Credit

25m Orange Caravan / Camping Hook up Extension Lead

25m Orange Caravan / Camping Hook up Extension Lead

25m Orange Caravan / Camping Hook up Extension Lead Cable with 16 amp Blue Plug and Socket £15 for one or £25 for both. Read more

Related products caravan 240v 25m long lead: 25m Orange Caravan / Camping Hook up Extension Lead
25M Orange Caravan/Motorhome/Camping Hook Up Extension Lead

25M Orange Caravan/Motorhome/Camping Hook Up Extension Lead

Surplus to requirements. Still in original packaging. Read more

caravan 240v mains extension lead

caravan 240v mains extension lead

240v mains extension lead for caravan /motorhome.good condition,will show it working.20ft long.collection only. Read More

Related products caravan 240v 25m long lead: caravan 240v mains extension lead
caravan 240v mains extension lead

caravan 240v mains extension lead

240v mains extension lead for caravan /motorhome.good condition,will show it working.20ft long.collection only. Read more

Sunn Camp 25m Caravan site to mains connection lead/hook up

Sunn Camp 25m Caravan site to mains connection lead/hook up

Sunn Camp 25m caravan site to mains connection lead with mains adapter. Excellent condition only used once. Includes original bag. Collection only £20 Ad ID: Delivery Service Consumer Credit

Related products caravan 240v 25m long lead: Sunn Camp 25m Caravan site to mains connection lead/hook up
25m Caravan Hook Up Extension Cable 230V 3pin Mains Transformer Electric Lead

25m Caravan Hook Up Extension Cable 230V 3pin Mains Transformer Electric Lead

Brand new. 25 meter orange cable - 3 core 1.5mm cable - Maximum current: 16 ampers - 240V - cable: 20 ampers - CE, ROHS Approved Ad ID: Delivery Service Consumer Credit

Caravan or Motorhome 25M Mains Lead Hook-Up Cable - Brand New Unused

Caravan or Motorhome 25M Mains Lead Hook-Up Cable - Brand New Unused

Brand new 25 metre mains hook-up cable for caravan or motorhome, orange cable for safe visibility on site, with blue standard connector plugs for UK mains voltage, V, up to 16Amp. Can be used with adaptors (not included) to connect to standard 13A socket or old style continental 2-pin if required.

Camping Caravan electric hook up 240v lead  metres

Camping Caravan electric hook up 240v lead metres

Orange 240 volt 16 amp hook up lead. metres long Cash on collection Read More

Contact