camping electric cable with 3 sockets and trip switch long lead only 25 for quick sale

CAMPING ELECTRIC CABLE WITH 3 SOCKETS AND TRIP SWITCH LONG LEAD ONLY £25 FOR QUICK SALE

CAMPING ELECTRIC CABLE WITH 3 SOCKETS AND TRIP SWITCH LONG LEAD ONLY £25 FOR QUICK SALE

CAMPING ELECTRIC CABLE WITH 3 SOCKETS AND TRIP SWITCH LONG LEAD ONLY £25 FOR QUICK SALE Ad ID: Delivery Service Consumer Credit

Electric hook up cable with 3 sockets and safety trip

Electric hook up cable with 3 sockets and safety trip

Comes with a bag, 30 metres long safety trip slightly used no offers Read More

Related products camping electric cable with 3 sockets and trip switch long lead only 25 for quick sale: Electric hook up cable with 3 sockets and safety trip
Electric power cable, suitable for camping. Complete with trip switch for safety

Electric power cable, suitable for camping. Complete with trip switch for safety

Perfect for lighting, heaters or charging phones while camping! Long cable. Has safety cut out. Ad ID: Delivery Service Consumer Credit

3 Gang 20m electric hookup lead with trip switch

3 Gang 20m electric hookup lead with trip switch

This is approx 20m long 3 x 3 pin uk sockets with a male hookup connector. Has a circuit breaker at the back of it. Great for camping. Pickup from Rayleigh Essex £35 Ad ID: Delivery Service Consumer Credit

Related products camping electric cable with 3 sockets and trip switch long lead only 25 for quick sale: 3 Gang 20m electric hookup lead with trip switch
Electric hook up cable 25 metres, 3 sockets for use with tent or awning

Electric hook up cable 25 metres, 3 sockets for use with tent or awning

Electric hook up cable 25 metres, 3 sockets for use with tent or awning used once. £30. Ad ID: Delivery Service Consumer Credit

10 m camping electric lead 3 sockets 16amp to 3 domestic sockets

10 m camping electric lead 3 sockets 16amp to 3 domestic sockets

approx 10 m camping electric lead 3 sockets 16amp to 3 domestic sockets with Euro adapter collection only Ad ID: Delivery Service Consumer Credit

Related products camping electric cable with 3 sockets and trip switch long lead only 25 for quick sale: 10 m camping electric lead 3 sockets 16amp to 3 domestic sockets
Electric hook up lead with sockets for camping

Electric hook up lead with sockets for camping

Only used half a dozen times at most. An essential for modern camping. Plenty long enough with three sockets. Ad ID: Delivery Service Consumer Credit

UK Camping Electric Hook Up Mains Supply Unit With 3 Sockets 20M Cable

UK Camping Electric Hook Up Mains Supply Unit With 3 Sockets 20M Cable

Used once by me then put in a cupboard for 3 years !! 3-way mobile mains unit 3 x 13 A sockets 20 m cable with UK site plug RCD circuit breakers Fully-certified to BS standards A mobile mains kit that can be used while away in your caravan, camping or for outdoor use. Simply plug to bring 230v power to your low wattage appliances. Suitable for all tents, can be hung up or clipped to a tent pole, table leg, etc. This is a fully protected unit with waterproof casing. Comes with 3 x 13 amp splash proof sockets, 10 Amp double pole main circuit breaker 25 amp RCD, 20m cable with UK site plug, 13 Amp Sockets to IPv plug to IEC/EN Cable to HO5 VVF. Fitted with a correct polarity. Warning light. Ad ID: Delivery Service Consumer Credit

Related products camping electric cable with 3 sockets and trip switch long lead only 25 for quick sale: UK Camping Electric Hook Up Mains Supply Unit With 3 Sockets 20M Cable
UK Camping Electric Hook Up Mains Supply Unit With 3 Sockets 20M Cable

UK Camping Electric Hook Up Mains Supply Unit With 3 Sockets 20M Cable

Used once by me then put in a cupboard for 3 years !! In exceptional condition. 3-way mobile mains unit 3 x 13 A sockets 20 m cable with UK site plug RCD circuit breakers Fully-certified to BS standards A mobile mains kit that can be used while away in your caravan, camping or for outdoor use. Simply plug to bring 230v power to your low wattage appliances. Suitable for all tents, can be hung up or clipped to a tent pole, table leg, etc. This is a fully protected unit with waterproof casing. Comes with 3 x 13 amp splash proof sockets, 10 Amp double pole main circuit breaker 25 amp RCD, 20m cable with UK site plug, 13 Amp Sockets to IPv plug to IEC/EN Cable to HO5 VVF. Fitted with a correct polarity. Warning light. Ad ID: Delivery Service Consumer Credit

Camping electric hook up cable new unused 10m long with site plug &UK4way switch socket

Camping electric hook up cable new unused 10m long with site plug &UK4way switch socket

Electric hook up cable for use with tent and awning New unused 10m long with blue site plug and 13amp 4way switched socket Ad ID: Delivery Service Consumer Credit

Related products camping electric cable with 3 sockets and trip switch long lead only 25 for quick sale: Camping electric hook up cable new unused 10m long with site plug &UK4way switch socket
caraven or camping 3 plug with trip switch for eletric hook up good condition

caraven or camping 3 plug with trip switch for eletric hook up good condition

3plug with trip switch long lead for eletric hook up very good working condition was over 100 Ad ID: Delivery Service Consumer Credit

CAMPING ELECTRIC EXTENSION CABLE WITH HOOK UP, CIRCUIT BEAKER, 4 SOCKETS AND NEON LIGHT.

CAMPING ELECTRIC EXTENSION CABLE WITH HOOK UP, CIRCUIT BEAKER, 4 SOCKETS AND NEON LIGHT.

Excellent condition, used once. No longer have Motorhome/awning. Brilliant for all those electrical gadgets in awning! Ad ID: Delivery Service Consumer Credit

Related products camping electric cable with 3 sockets and trip switch long lead only 25 for quick sale: CAMPING ELECTRIC EXTENSION CABLE WITH HOOK UP, CIRCUIT BEAKER, 4 SOCKETS AND NEON LIGHT.
Brand New Electric Hook Up for tents, camping. 15m cable RCD Mini Circuit Breaker & 3 plug sockets

Brand New Electric Hook Up for tents, camping. 15m cable RCD Mini Circuit Breaker & 3 plug sockets

Brand new electric hook up for tents, awnings, caravans, motorhomes or boats - anywhere you need power. The plug sockets are arranged horizontally which means no more tangled wires or blocked sockets. This has built-in current protection and is essential for using electrical items like a fridge or lights, or for charging mobile devices, while you are at the campsite. It has a circuit breaker and RCD which protects you and your equipment, while the 15m cable with 240v site mains plug makes it easy to connect directly to your site post. Durable and dependable mains power - simply plug into the site post. Can be hung up or clipped to a tent pole - allows you to keep it off the floor and out of the way. Three UK 3-pin sockets - splash proof IP44 rated with covers. Protects you and your equipment - with a 10 Amp double pole Mini Circuit Breaker and a 25 Amp Residual Current Device. Extra long lead - durable 15m orange lead with 240v site plug. £45 O.N.O. Please text on or email if interested. Collect from Merthyr or local delivery possible. Ad ID: Delivery Service Consumer Credit

Underdesk Power Modules with Master Switch (4 and 6 sockets) Extension Lead

Underdesk Power Modules with Master Switch (4 and 6 sockets) Extension Lead

ONLY 4 SOCKET MODULES LEFT Modular Desk Power Supply - Under Desk Power Module 4 and 6 socket modules available, 15 available in total. Not all of them have the main lead but can be purchased separately. £5 each or £50 O.N.O. for the whole lot.

Related products camping electric cable with 3 sockets and trip switch long lead only 25 for quick sale: Underdesk Power Modules with Master Switch (4 and 6 sockets) Extension Lead
Underdesk Power Modules with Master Switch (4 and 6 sockets) Extension Lead

Underdesk Power Modules with Master Switch (4 and 6 sockets) Extension Lead

ONLY 4 SOCKET MODULES LEFT Modular Desk Power Supply - Under Desk Power Module 4 and 6 socket modules available, 15 available in total. Not all of them have the main lead but can be purchased separately. £3 each or £10 for the whole lot. Just found another three modules but with no cables that I'll inlude in sale if sold for asking price.

Underdesk Power Modules with Master Switch (4 and 6 sockets) Extension Lead

Underdesk Power Modules with Master Switch (4 and 6 sockets) Extension Lead

Modular Desk Power Supply - Under Desk Power Module 4 and 6 socket modules available, 15 available in total. Not all of them have the main lead but can be purchased separately. £5 each or £50 O.N.O. for the whole lot.

Related products camping electric cable with 3 sockets and trip switch long lead only 25 for quick sale: Underdesk Power Modules with Master Switch (4 and 6 sockets) Extension Lead
NEW CREAM RECLINING LOUNGER WITH SUN SHADE ONLY OPENED TO TAKE PHOTO ONLY £25 FOR QUICK SALE

NEW CREAM RECLINING LOUNGER WITH SUN SHADE ONLY OPENED TO TAKE PHOTO ONLY £25 FOR QUICK SALE

NEW CREAM RECLINING LOUNGER WITH SUN SHADE ONLY OPENED TO TAKE PHOTO ONLY £25 FOR QUICK SALE Ad ID: Delivery Service Consumer Credit

Camping Mains Supply Unit with 3 sockets - 20 m cable

Camping Mains Supply Unit with 3 sockets - 20 m cable

Mains Supply Unit complete with 3 sockets and circuit breaker. 20 m cable. A must have for any camping trip for electricity supply. Nearly new - only used a handful of times. Paid £ Will send photo on request if required. Open to reasonable offers. Complies with BS standards Ad ID: Delivery Service Consumer Credit

Related products camping electric cable with 3 sockets and trip switch long lead only 25 for quick sale: Camping Mains Supply Unit with 3 sockets - 20 m cable
Hook up lead, camping electric hook up lead 10m long with blue site plug and 13amp 4way socket new

Hook up lead, camping electric hook up lead 10m long with blue site plug and 13amp 4way socket new

New unused camping hook up cable 10m long with blue site plug and 13amp 4way socket Ad ID: Delivery Service Consumer Credit

Quality long brand-new, VGA cable, quick sale at only £10

Quality long brand-new, VGA cable, quick sale at only £10

Quality long brand-new, VGA cable, quick sale at only £10 please check my other ads too, thanks Ad ID: Delivery Service Consumer Credit

Related products camping electric cable with 3 sockets and trip switch long lead only 25 for quick sale: Quality long brand-new, VGA cable, quick sale at only £10
Camping electric hook up cable NEW unused 10m long with 4way 13amp socket for use with tent /awning

Camping electric hook up cable NEW unused 10m long with 4way 13amp socket for use with tent /awning

New unused camping hook up cable 10 m long with blue site plug and UK 4way 13amp socket Suitable for use with tent or awning Ad ID: Delivery Service Consumer Credit

Camping electric hook up cable NEW unused 10m long with 4way 13amp socket for use with tent /awning

Camping electric hook up cable NEW unused 10m long with 4way 13amp socket for use with tent /awning

New unused camping electric hook up cable 10m long with UK 13amp socket and blue euro site plug Ad ID: Delivery Service Consumer Credit

Related products camping electric cable with 3 sockets and trip switch long lead only 25 for quick sale: Camping electric hook up cable NEW unused 10m long with 4way 13amp socket for use with tent /awning
Camping electric hook up cable new 10m long with blue site plug and 4way socket 13amp

Camping electric hook up cable new 10m long with blue site plug and 4way socket 13amp

Brand new unused camping hook up cable with blue Euro site plug and 13amp 4way socket 10m long over 33feet Ad ID: Delivery Service Consumer Credit

Camping electric hook up cable new unused 10m long with blue site plug and 4way socket

Camping electric hook up cable new unused 10m long with blue site plug and 4way socket

Electric hook up cable for use with tent or awning brand new unused 10m long with blue site plug and UK 4way 13amp socket Ad ID: Delivery Service Consumer Credit

Related products camping electric cable with 3 sockets and trip switch long lead only 25 for quick sale: Camping electric hook up cable new unused 10m long with blue site plug and 4way socket
Camping electric hook up cable new 10m long with blue site plug and 13amp 4way socket

Camping electric hook up cable new 10m long with blue site plug and 13amp 4way socket

New unused camping site hook up cable with 4way 13amp UK socket and blue Euro site plug 10m over 32feet long Ad ID: Delivery Service Consumer Credit

Contact