2 x 152m long leaded stained glass art deco windows or sell separately r506a

2 x 1.52m long leaded stained glass art deco windows OR SELL SEPARATELY. R506a

2 x 1.52m long leaded stained glass art deco windows OR SELL SEPARATELY. R506a

£80 each. frame 39.2 x 152cm Condition - one of the panels needs new putty along the bottom edge - see final photo. Ad ID: Delivery Service Consumer Credit

4 x leaded light stained glass windows OR SELL SEPARATELY. R500

4 x leaded light stained glass windows OR SELL SEPARATELY. R500

Only the sash frames are for sale. The window frame as pictured insitu is not available. When sashes are combined the size is x 110cm. Inividually the sashes are: 2 x large x 54.9cm 2 x small 46 x 55.1cm £215 for set. I am prepared to sell individually. Condition (see final four photos): There is a small cracked piece (although glass intact) in each panel with the exception of a small window which has two cracked pieces one of which is noticeable. Ad ID: Delivery Service Consumer Credit

Related products 2 x 152m long leaded stained glass art deco windows or sell separately r506a: 4 x leaded light stained glass windows OR SELL SEPARATELY. R500
ART DECO STAINED GLASS LEADED WINDOW

ART DECO STAINED GLASS LEADED WINDOW

STUNNING PIECE. SUZE 69 X 72 cms. Thanks Read More

2 internal leaded light stained glass doors OR SELL SEPERATELY. R476

2 internal leaded light stained glass doors OR SELL SEPERATELY. R476

x 80 x 3.5cm £195 each. I don't think either door has ever had paint or varnish which saves time if you want to decorate! Both come with good hinges one door comes with a handle. Viewing in Harrow welcome with no obligation to buy. Ad ID: Delivery Service Consumer Credit

Related products 2 x 152m long leaded stained glass art deco windows or sell separately r506a: 2 internal leaded light stained glass doors OR SELL SEPERATELY. R476
Art Deco Style Leaded Stained Glass Wall Mirror

Art Deco Style Leaded Stained Glass Wall Mirror

For sale hand crafted leaded stained glass wall mirror. Size cm) square. Edges are purple stained glass. Already wired for hanging on the wall. Asking £10. Collection only from Allington near Grantham NG32. To view please ring Thanks for looking please see my other items. Ad ID: Delivery Service Consumer Credit

Leaded light stained glass door set with keys or for sale separately. R452

Leaded light stained glass door set with keys or for sale separately. R452

Door - £240, side window £100 Door 213 x 91.1 x 4.5cm window frame 93 x 71.2, glass 80 x 63cm No cracks in glass. Viewing in Harrow welcome with no oblitation to buy. Ad ID: Delivery Services Consumer Credit

Related products 2 x 152m long leaded stained glass art deco windows or sell separately r506a: Leaded light stained glass door set with keys or for sale separately. R452
4 x leaded stained glass windows

4 x leaded stained glass windows

4 x leaded stained glass windows 2 x measure 55.5cm x 56cm 2 x measure 60cm x 58.5cm Top opening hinged windows Open to offers and can deliver in a reasonable distance for a small charge Ad ID: Delivery Service Consumer Credit

ARCHITECTURAL STAINED LEADED GLASS WINDOWS X 3

ARCHITECTURAL STAINED LEADED GLASS WINDOWS X 3

JOBLOT ARCHITECTURAL STAINED LEADED WINDOW GLASS X 3 DIMENSIONS ROUGHLY 40CM X 40CM NO CRACKS AND LOVINGLY TAKEN OUT OF A VERY OLD HOUSE YOU ARE BUYING THREE WINDOW PANES AS IN THE PICTURE CASH ON COLLECTION ONLY FROM W7- HANWELL GIVE ROB A CALL ON Ad ID: Delivery Service Consumer Credit

Related products 2 x 152m long leaded stained glass art deco windows or sell separately r506a: ARCHITECTURAL STAINED LEADED GLASS WINDOWS X 3
Art Deco Stained Glass Windows Set of 3

Art Deco Stained Glass Windows Set of 3

This set of Art Deco design stained glass windows are in wooden frames. I estimate them to be 's. The second and third photos show how we have used more from the set in our home. The glass is in excellent condition with no chips or cracks. One window is 41cm x 30.5 cm The other two windows are 41cm x 26cm They can be collected from postcode WS1 We are close to J10 & 7 of the M6 Questions, please ask. Read More

Art Deco Leaded Windows

Art Deco Leaded Windows

Four beautiful Art Deco Leaded Window which have been restored by Steve Cartwright of Bromsgrove. They require no work and are ready to install. The pictures do not do them justice. I purchased 7 in their frames and had them removed and repaired where necessary. Only three were needed hence the sale of these four. Two measure 39 cm high by 44 cm wide ( inches X inches) Two measure 41 cm high by 47 cm wide (16 inches X 18.5 inches) Priced to sell at £40 each or £120 for all four. Cash on collection please Ad ID: Delivery Service Consumer Credit

Related products 2 x 152m long leaded stained glass art deco windows or sell separately r506a: Art Deco Leaded Windows
Leaded 's Stained glass windows

Leaded 's Stained glass windows

7x 45cmx103cm glass, 1 is damaged 7x 45cmx33cm glass, 1 has slight damage. All windows have been taken out and stored. The measurement is the glass only as some of the wood frames are not salvageable. The glass is about 's Read More

Stained glass leaded door and windows

Stained glass leaded door and windows

Hi there here i have antique stained glass leaded door and windows for sale,all sizes in inches.doesnt seem to be any rot in them 1 x door 35 x 69 2 windows 18 x windows 26.5 x 17 2 windows 18 x windows 20.5 x 17.5 Read More

Related products 2 x 152m long leaded stained glass art deco windows or sell separately r506a: Stained glass leaded door and windows
3 x Tiffany Stained Glass Pendant Golden Lightshades Lampshades Art Deco Nouveau

3 x Tiffany Stained Glass Pendant Golden Lightshades Lampshades Art Deco Nouveau

3 x Tiffany Stained Glass Pendant Golden Lightshades Lampshades Art Deco Nouveau A set of 3 matching Tiffany pendant light shades. They are made of stained glass and lead and are octagonal in shape with cream and brown and golden tones to the glass. The pendant lights all have a circular metal fixing to can be easily attached to a standard light fitting.   The light shades are in Excellent Used Condition. There is wear to the metal circular fixing in the centre from previous use, but this can't be seen as will be above a light bulb and out of sight. The glass is pristine on all the light fittings except on one of the octagonal shades, which has a fine hairline crack, as pictured, on the top part of a small cream panel, which wouldn't be seen due to it's position. The octagonal shades individually measure 20cm's in height x 31cm's in diameter at the widest part. Any questions please feel free to ask. Many other items available from our art studio. Collection please from the centre of Huddersfield, HD1. Thank you. Ad ID: Delivery Service Consumer Credit

Four stained and leaded glass windows in frames (probably Victorian)

Four stained and leaded glass windows in frames (probably Victorian)

Set of four frames. Approx size 37 x 60 cms excluding frames. Good condition, no cracks or breaks to glass. Buyer collects Ad ID: Delivery Service Consumer Credit

Related products 2 x 152m long leaded stained glass art deco windows or sell separately r506a: Four stained and leaded glass windows in frames (probably Victorian)
Long leaded light stained glass window panel partition. R593

Long leaded light stained glass window panel partition. R593

Frame x 37 x 4.8cm, top glass 15 x 26.3cm, lower glass 110 x 26.3cm, 16.5kg. One tiny piece cracked – see final photo. £50 Ad ID: Delivery Service Consumer Credit

Long leaded light stained glass window panel partition. Some damage. B593

Long leaded light stained glass window panel partition. Some damage. B593

Length 219cm. Width minus excess 32cm, depth 4.5cm top glass 15 x 26.3cm, lower glass 110 x 26.3cm 12kg Numerous breaks in glass. £5 – price to clear! Ad ID: Delivery Service Consumer Credit

Related products 2 x 152m long leaded stained glass art deco windows or sell separately r506a: Long leaded light stained glass window panel partition. Some damage. B593
Leaded light stained glass door. Internal or external. R305

Leaded light stained glass door. Internal or external. R305

Door size x 83.1 x 3.8cm. Each glass panel 89.8 x 26.3cm Viewing in Harrow welcome with no obligation to buy. Ad ID: Delivery Services Consumer Credit

Art Deco Stained Glass Panel

Art Deco Stained Glass Panel

vibrant stained glass panel. 46.5 x 43.5cm. welcome to view or ask for additional info etc. Read More

Related products 2 x 152m long leaded stained glass art deco windows or sell separately r506a: Art Deco Stained Glass Panel
Hall lantern - original Art Nouveau with attractive leaded stained glass set in verdigris copper

Hall lantern - original Art Nouveau with attractive leaded stained glass set in verdigris copper

This superb, original Art Nouveau lantern dates between and . It has 3 curved panels set within its verdigris copper frame which gives it great charm and character. It has its original copper chain for suspending from a ceiling rose. This lovely lantern measures 14ins high and is 7ins wide. To view please phone me on . Ad ID:

Art Deco Tall Stained Glass Panel

Art Deco Tall Stained Glass Panel

Tall deco glass panel. 122 x 23 cm. welcome to view or more photos info etc Read More

Related products 2 x 152m long leaded stained glass art deco windows or sell separately r506a: Art Deco Tall Stained Glass Panel
A407 Art Deco doorOriginal Stained Glass

A407 Art Deco doorOriginal Stained Glass

Lovely old door.All original. Classical stained glass Art Deco insert. H. 206. W.34 Depth5 cms.. Pickup welcome. Very low shipping rates with carrier. Read More

Art Deco s Stained glass panel

Art Deco s Stained glass panel

Art Deco s stained glass panel 81cm W x 39.5cm H 32" W x " H Panel in good condition no cracks. Can deliver locally. Ad ID: Delivery Service Consumer Credit

Related products 2 x 152m long leaded stained glass art deco windows or sell separately r506a: Art Deco s Stained glass panel
8 Art Deco Stained Glass Panels

8 Art Deco Stained Glass Panels

collection of 8 different panels. art deco taken from local public house. Blue chevron and cross designs. various sizes. ideal for project or upcycling. welcome to view etc Read More

Art Deco door with stained glass insert

Art Deco door with stained glass insert

£85 Pickup welcome. Can recommend Anyvan or Shiply for low carrier prices.My post code CH437XL Read More

Related products 2 x 152m long leaded stained glass art deco windows or sell separately r506a: Art Deco door with stained glass insert
Art Deco Stained Glass French Doors c

Art Deco Stained Glass French Doors c

Stunning Art Deco French Doors c, Blue bird and Sunray panels, Original and Totally Straight, A small amount of paint has been removed to reveal clear, solid pitch pine, A quality build, with a door frame thickness of 50mm/ 2" they were built for external use but have remained as internal doors which has preserved and protected them over the years, Height mm/ 79.5 " Width mm/ " Frame 50mm/ 2" Ad ID: Delivery Service Consumer Credit

Contact